Kabrai Feeder
- Home
- Project Details
Salient Features of The Project
Work Done Value - (Rs. in Cr.) 82.93
- Project Name: Const. of E/W and Canal Structures worksi n Kabrai Feeder Channel Dist. Mahoba (UP)
- Village/Tehsil/District : Mahoba
- Source River : Dhasan
- Kabrai Dam (Including new area of 54,087 Ha.) : 70,997 Hact.
- Pond level of Lahchura weir : R.L. 182.30 m.
Length of feeder canal
- From Lahchura to Arjun Dam : 38.60 Km.
- From Arjun to Kabrai Dam : 31.30 Km.
- F.S.L of feeder at head : R.L. 181.97 m.
- Bed level of Feeder Head : R.L. 179.74 m.
Proposed extra area of irrigation
|
|
Rabi |
Kharif |
Total |
Kabrai Dam |
: |
18018 Hect. |
11354 Hect. |
29372 Hect. |
Water requirement of Arjun Sahayak Feeder at Lahchura head
- Arjun Dam : 7013 Hect.m.
- Chandrawal Dam : 2189 Hect.m.
- Kabrai Dam : 16667 Hect.m.
- Drinking Water : 2000 Hect.m.
- Total : 27869 Hect.m.